Title: Discussion and possible action regarding the addition of drain down equipment for the existing detention center to the BET Watchlist for FY25-26. This equipment is needed to prevent the HVAC chilled water coils from freezing during cold weather events. This equipment is currently estimated at $280,000.00 but may increase by the time of actual approval and installation. Requested by Paul Foster, Chief Deputy, District 3.

title

Discussion and possible action regarding the addition of drain down equipment for the existing detention center to the BET Watchlist for FY25-26. This equipment is needed to prevent the HVAC chilled water coils from freezing during cold weather events. This equipment is currently estimated at $280,000.00 but may increase by the time of actual approval and installation. Requested by Paul Foster, Chief Deputy, District 3.