Title:
|
Discussion and possible action regarding the addition of drain down equipment for the existing detention center to the BET Watchlist for FY25-26. This equipment is needed to prevent the HVAC chilled water coils from freezing during cold weather events. This equipment is currently estimated at $280,000.00 but may increase by the time of actual approval and installation. Requested by Paul Foster, Chief Deputy, District 3.
|